phantom Posted December 9, 2021 Share Posted December 9, 2021 https://www.adirondackalmanack.com/2021/12/nysdecs-management-fiasco-in-the-high-peaks-wilderness-area.html A very strange thing happened this fall in the High Peaks Wilderness Area. The Department of Environmental Conservation (DEC) worked for weeks in 2021 with heavy machinery to rebuild an old logging road in the Dudley Brook area of the MacIntyre East section of the High Peaks Wilderness. This is the same area where the DEC had worked for months in 2019 and 2020 to tear apart old logging roads. However, the DEC says they’re not rebuilding the road; they say they’re simply correcting a massive mistake that somehow its leaders in Albany had failed to notice for the last two years. This is one of the strangest things I’ve seen in Forest Preserve management at the DEC in the last two decades. In 2019, DEC approved a work plan to do something new and different. The DEC set out in 2019 and 2020 to expedite ecological restoration and reclaim a series of old logging roads in newly purchased and newly classified lands in the MacIntyre East section of the High Peaks Wilderness. These lands are on the south side of the Opalescent River, include the southwestern flanks of Allen Mountain, and are bordered by conservation easement lands and a Primitive Corridor logging road. Since DEC work plans are not published, and since this is a trailless section of the High Peaks Wilderness where public access is difficult, involving a deep ford of the Opalescent River, we did not learn about this work right away. We had heard about similar road reclamation work in the Boreas Ponds area, but public access to that area has been limited and restricted in recent months. There are many old logging roads in Wilderness Areas, such as the Burn Road in the William C. Whitney Area, among many others, that see slow change over the decades as the forest steadily, but incrementally, eats away at them and reclaims these roadways. Many of these old roads retain old culverts and human geometric forms from benchcuts, banking, grading, and borrow pits, among other road construction features, for decades. In the MacIntyre East and Boreas Ponds areas, DEC organized work crews in 2019 and 2020 to tear apart these road corridors, and build a series of pits and mounds (see below) that mimic the natural forest, with the objective of changing the long linear geometry of these road corridors and expediting forest reclamation. (Click here for pictures of abandoned roadways where pits and mounds were built to restore the road corridor.) This work covered nearly 20 miles total of abandoned roads. A section of ecologically reclaimed road. The DEC reversed course suddenly, and without any public notice, at some point in 2021, DEC leaders in Albany did an about-face. After field visits, DEC’s Albany team organized a new effort to go back in to the old logging roads and tear out the mounds and fill in the pits. This effort had the effect of reconstituting a roadway. DEC leaders say that rebuilding a roadway was not their aim. Their objective, they contend, was to correct mistakes made in 2019 and 2020 that had escaped their notice, to protect water quality and public safety, and improve forest regeneration. Quote Link to comment Share on other sites More sharing options...
ncountry Posted December 9, 2021 Share Posted December 9, 2021 Sad. Typical NY state. 2 Quote Link to comment Share on other sites More sharing options...
Nytracker Posted December 9, 2021 Share Posted December 9, 2021 Lol no notification... no public announcement no public plans .... typical pissing money away ... what else is new. 1 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.